Production Line Bottleneck Removal
Full process audit of the assembly line: identified three major bottlenecks and automated handoff points, cutting cycle time.
30% downtime reduction · 20% throughput increaseTechnical audit
Three weeks to find where it jams, in your code or between your tools, and a report your team applies without us.
Start a ProjectReply within 24 hours
The slowdown is not in the same place. What we do next does not change.
“Every release takes longer than the one before it.”
We read the code, the release history and the incidents of the last six months.
“Our tools do not talk to each other, and someone retypes everything by hand.”
We follow one whole operation, from the request to the invoice, and count the manual steps.
Manufacturing mandate. Bottlenecks removed.
Mandates delivered for SME clients. Names are omitted under confidentiality agreements, and the figures describe the outcome on that specific mandate, not an average or a guarantee.
You stop nothing during that time. Your team keeps working, and we watch while it does.
We look at what is already there: the code if you have any, otherwise the tools, the files and the path a request takes.
Nothing yet. We stay out of your way.
We talk to your team, one hour each, separately and without you in the room.
A first list of what stands out, to check we are looking in the right place.
We cost each point in days lost per month, then we rank them.
The report, and two hours with your team to walk through it.
A document, not a presentation. It reads without us, and it still reads in six months.
What slows the team down, ranked by cost in days lost per month, most expensive first.
For each point, what has to change, how many days it takes, and who on your side can do it.
Where to start if you can only do three this year. It is the page people reread most.
How to check in three months that it worked, with the figures to take again.
Two hours with your team. Recorded, for whoever was not there.
A fixed price, stated before we start, that does not move. The audit has a known length and a known deliverable, so there is no reason to bill by the hour. If three weeks turn into four, that is our problem.
Fixed priceTo confirmThree mandates already published on this site, the ones where the work started by understanding before rewriting.
Full process audit of the assembly line: identified three major bottlenecks and automated handoff points, cutting cycle time.
30% downtime reduction · 20% throughput increaseConsolidated 4 fragmented legacy systems into a unified modern ERP with real-time reporting and cross-department visibility.
35% reporting time saved · Full system integrationReplaced a decade-old desktop system with a secure browser-based platform. Staff access records from any device, with full audit trails.
25% faster record retrieval · Full data migrationMandates delivered for SME clients. Names are omitted under confidentiality agreements, and the figures describe the outcome on that specific mandate, not an average or a guarantee.
That is the main risk, and at Sunny Code Solutions we work to avoid it. We meet each person separately and without management present, and the report talks about what slows the work down, never about who works badly. A team that feels accused hides what it knows, and then the audit finds nothing. On most mandates the team had already identified half the problems and nobody had asked them.
No. A technical audit at Sunny Code Solutions runs over three weeks while the team keeps working normally. That is in fact preferable: we see how the work really goes rather than a frozen version of it. The only demand on time is one hour of interview per person, plus two hours at the end to walk through the findings.
The report lists what slows the team down, ranked by cost in days lost per month, most expensive first. Each point comes with the fix, the number of days it takes, and who can do it in house. It ends with the order to follow if you can only handle three points this year, and the measures to take again in three months to check it worked.
No, and the report is written so that it does not have to. Each fix names who can do it in house. An audit whose conclusions can only be applied by whoever wrote it is not an audit, it is a sales proposal. If you do want us to carry them out, that is a separate mandate, decided after you have read the report.
You describe what is slowing down. If the problem is obvious and free to fix, we tell you and we stop there.
Start a ProjectReply within 24 hours